Gällö Timber 15 MW Hot water plant
15 MW hot water to kilns for a saw mill
PLANT REPORT SAX 725
Saxwerk have signed order to deliver a 15 MW boiler plant to Gällö Timber for their kilns at the saw mill.
Saxwerk delivered turn key plant with fuel handling, refractory line combustion unit, boiler, flue gas system, pipe system, building.
Technical data: | |
---|---|
Fuel to combustion: | Wood chips, bark |
Capacity boiler: | 15 MW |
Grate area: | 31,2 m2 |
Fuel bunker: | 2 x 250 m3 |